banner
Tutorial on UPARK's no-drain automatic bollard installation and construction programme
Jul 25 , 2025

UPARK Drain-Free Automatic Bollard Installation Construction Requirements Specification (can also be a full row of roadway excavation, because our bollards are drain-free design, the bottom does not need to do the drainage system)


1、Excavation foundation
The depth of excavation foundation for each bollard is: 500x500x1100mm; the width of wire channel is 100mm; the depth of wire channel is 200mm;


Place bollards, connect cables, adjust level to same horizontal position


Backfill concrete and restore pavement



Construction section

UPARK website ~ https://www.uparkbollards.com

Professional security bollards/roadblocks/fences manufacturer Make our cities safer, and our travel better.

call us :

+86 18206096507
Leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
copyright © 2026 UPARK Xiamen Meihao Chuxing Iot Technology Co., Ltd.all rights reserved. /
ipv6 network supportedipv6 network supported
Leave a message
VRV
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

home

products

about

contact